
3. Operation
1
.-
Cooling water drain cocks
1. Open the water drain cocks
(3
positions
as illustrated) and drain the cooling
water from inside.
2.
Close the drain
cocks
after draining the
water.
(3)
Carry
out
the next periodic inspection
before placing the engine in storage. Clean
the outside
of
the engine wiping
off
any
dust
or
oil.
(4)
To
prevent condensation inside the fuel
tank, either drain
off
the fuel
or
fill the tank.
(5)
Grease the exposed area
and
joints
of
the remote control cable
and
the bearings
of
the remote control handle.
(6)
Cover the intake silencer, exhaust
pipe
,
etc. with vinyl sheets
and
seal them to
prevent moisture from entering.
(7)
Drain bilge in the hull
bottom
com-
pletely. Water may leak into the
boat
when
it
is moored,
and
whenever possible
it
should
be
landed.
(B)
Waterproof the engine room to prevent
rain
and
seawater from entering.
(9)
During long term storage, charge the
battery once
a month to compensate
for
the battery's self-discharge.
33
Komentáře k této Příručce